Analisa Pengaruh Tingkat Penerapan BIM 5D Terhadap Kinerja Waktu Proyek Konstruksi

Authors

  • Imam Sugeng Santoso
  • Agus Suroso
  • Mawardi Amin

DOI:

https://doi.org/10.31599/s1vpbf30

Keywords:

BIM, BIM5D, Time, Performance

Abstract

In construction, risks are usually requests for additional time, cost, or quality of work. Disputes will 
occur If risks are not resolved properly. In the industrial revolution 4.0, we can use the Building 
Information Modeling (BIM) method to increase efficiency. BIM is a digital display that contains all 
information about building elements integrated with the building's life cycle period. BIM will optimize 
the performance of construction projects. In Indonesia, several consultants/contractors have 
implemented BIM in construction projects. This study aims to determine and analyze what factors in the 
process of implementing BIM 5D that affect the performance of construction project time. The research 
method used is descriptive research method with the Q-method approach using closed survey research 
instruments to 53 contractor/consultant respondents using BIM. The results obtained from the 5D BIM 
indicators have 3 effects on the time performance of construction projects. 