Peningkatan Peluang Bisnis Strategis Pada Pemasangan SPM dan Jalur Pipa Bawah Laut Proyek Supply Avtur ke Bandara Soekarno Hatta Dari Refinery Unit VI Balongan

Authors

  • Edy Soesanto Edy FT-Perminyakan Universitas Bhayangkara

DOI:

https://doi.org/10.31599/jaring-saintek.v2i2.295

Keywords:

Strategic Business Opportunities for Installing SPM and Underwater Pipeline.

Abstract

Increasing business opportunities from an economic aspect that includes the financial performance of the Refinery Unit VI is very important to manage. Good financial performance will support the company's business continuity, and also have a positive impact on stakeholders. Refinery Unit VI's commitment to improving financial performance is very high, and strives to achieve predetermined key performance indicators (KPI). Refinery Unit VI measures the achievement of KPI regularly every quarter as part of the evaluation.

Targets related to current economic performance are the achievement of KPIs on Refinery Gross Margin and Net Margin. The person in charge for recording and reporting financial performance is under the Financial Function. Refinery Unit VI uses Internal Control over Financial Reporting (ICoFR) to control financial reports, where each function that has the authorization uploads it on the ICoFR web system. In 2017, Refinery Unit VI succeeded in 100% compliance with the IcoFR.

The realization of the Refinery Unit VI financial performance from 2015 was always above the target despite fluctuations in product prices. This is a good thing, supported by the achievement of the increasing Gross Refinery Margin and Net Margin from 2015–2017. Refinery Unit VI has continuously succeeded in improving financial performance and achieving the highest Gross Refinery Margin among all Refinery Units owned by PT Pertamina (Persero).

The installation of SPM and subsea pipelines is the target of increasing the Refinery Unit VI development program.

Downloads

Download data is not yet available.

References

Det Norske Veritas, 2013, DNV-OS-F101 Submarine Pipeline Systems. Norwegia : Det Norske Veritas.

Det Norske Veritas, 2013, DNV-RP-E305 On-Bottom Stability Design of Submarine Pipelines. Norwegia : Det Norske Veritas.

Haldar, Achintya dan Sankaran Mahadevan, 2000, Probability, Reliability and Statistical Methods in Engineering Design. New York : John Wiley & Sons, Inc.

Pengkajian Energi Universitas Indonesia,
Indonesia Energy Outlook and Statistics 2006,PEUI, Depok, 2007.

Klaus D. Timmerhaus &, Max S. Peter, Plant Design and Economic for Chemical Engineering, 4th ed., McGraw-Hill, Singapore, 1991, p. 910.

I. Soeharto, "Manajemen Proyek dari konseptual sampai operasional," Jakarta: Erlangga, 1995.

F. D. Anggraini and N. L. P. Hariastuti, "Analisis Risiko Pemasangan Pipa Baja Pada PT Bali Graha Surya," Jurnal Teknik Industri, vol. 14, pp. 146-159, 2014.
C. Sadhana and S. Shanmugapriya, "Assessment of Risk in Construction Projects by Modified Fuzzy Analytic Hierarchy Process," 2017.
Artikel ini telah tayang di Kompas.com dengan judul "Pipa Bawah Laut Kilang Balongan Mulai Dibangun", Klik untuk baca: https://money.kompas.com/read/2017/02/16/163528626/pipa.bawah.laut.kilang.balongan.mulai.dibangun

Published

2020-10-29