Analisa Penjadwalan Produksi Emergency Air Reciever dengan Menggunakan Master Production Schedule di PT. Boma Bisma Indra

Authors

  • Muchammad Assaabiq ITSNU Pasuruan
  • Ratna Diah Yuniawati ITSNU Pasuruan

DOI:

https://doi.org/10.31599/fawzek44

Keywords:

industrial equipment machinery division, make to order, master production schedule, PT. Boma Bisma Indra

Abstract

PT Boma Bisma Indra (Persero) is a State-Owned Enterprise (BUMN) which has 3 divisional business units, one of which is the industrial machinery and equipment division (MPI) and the foundry unit located on Jl. Imam Bonjol No. 18 Bugul Lor, Pasuruan City, East Java. The industrial machinery and equipment division and foundry unit (MPI) located in Pasuruan has grown rapidly as a company that focuses on manufacturing machinery and produces products such as Oil & Gas/ Refinery / Petrochemical Industries, Power plans, Iron Casting, and Pressure Vessels. In PT. Boma Bisma Indra, whose orientation is a make-to-order company, where the new company will procure raw materials and run production if there is a request from the customer. Difficulties that are often encountered in make-to-order companies are delays in the arrival of raw materials, and process delays caused by inadequate workers. Therefore, a method called the Master Production Schedule (MPS) is needed where this method will determine the time period that will be required for each process starting from the preparation of documents related to procedures and product specifications to the finishing fabrication process. This research focuses on timeliness analysis in every process in the master production schedule using the master production schedule (MPS) method

Downloads

Download data is not yet available.

References

BBI, P. (2021, September 18). Divisi Mesin Peralatan Industri. Retrieved from Boma Bisma Indra Website: http://ptbbi.co.id/mpi

Dzikrillah N, Purba HH, Suwazan D, Wahjoedi N. (2016). Pengendalian Persediaan Melalui Penentuan Produk Strategi. SOSIO-E-KONS, 169-174.

Hendrawan, C. T. (2019). Laporan Kerja Praktek di PT Mancananjaya Cemerlang. Praktek Kerja Lapangan, 1-29.

Herdiyanto R, Yuniar I, Sukawati R. (2019). Aplikasi Material Requirement Planning Mempertimbangkan Waktu Pemesanan Bahan Baku. The Best: Accounting Information Systems and Information Technology Business Enterprise, 91-105.

Novianti D, Maksudi, Inten S. (2020). Rancang Bangun Sistem Production Planning And Inventory Control (PPIC) Untuk Menentukan Estimated Time Departure (ETD) Pada PT Balagi Rattan Cirebon. Jurnal Teknik Informatika, 44-53.

Regawa, H. G. (2019). Perancangan Alat Bantu Untuk Memperbaiki Proses Perencanaan Produksi Pada PT X. Jurnal Manajemen Maranatha, 21-34.

Sidiq NM, Sutoni A. (2017). Perencanaan dan Penentuan Jadwal Induk Produksi di PT. Arwina Triguna Sejahtera. Jurnal Media Teknik dan Sistem Industri, 11-25.

Supriyadi, Riskiyadi. (2016). Penjadwalan Produksi IKS-FILLER Pada Proses Ground Calcium Carbonate Menggunakan Metode MPS di Perusahaan Kertas. SINERGI, 157-164.

Downloads

Published

2024-05-14

Issue

Section

Artikel